defirisk.co
rubric v1.7.0

Proposal execution delay < 24h

Lombard Finance's assessment for RD-F-038 — scored red on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

LombardTimeLock minDelay = 3600 seconds = 1 hour. All proxy upgrades are executable 1 hour after scheduling. This is well below the 24-hour threshold. The most recent upgrade (2026-04-24) was executed after only 1-hour delay per TimeLock.

Sources #

  • Tx
    0x70e7eb22979240dd2d86009d353e90e9ea597d47069a6e81214461e51f6c6ce4retrieved 2026-05-05
  • Etherscan
    https://etherscan.io/address/0x055E84e7FE8955E2781010B866f10Ef6E1E77e59retrieved 2026-05-05

Methodology #

Determine whether the time between a governance proposal passing and its executability (including any internal delay) is less than 24 hours.

See the full factor methodology and distribution across all protocols →

rubric_version v1.7.0 protocol lombard factor RD-F-038 score red collected_at 2026-05-05 12:03:08