defirisk.co
rubric v1.7.0

Hot-patch deploys without timelock (last 30 days)

Lombard Finance's assessment for RD-F-138 — scored green on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

The 2026-04-24 upgrade was routed through LombardTimeLock (schedule tx 2026-04-21, execution 2026-04-24 — 3-day gap exceeds 1h minimum). TimeLock shows 3 total transactions with most recent being the April 2026 upgrade. No evidence of hot-patch bypassing the TimeLock in last 30 days.

Sources #

  • Tx
    0x70e7eb22979240dd2d86009d353e90e9ea597d47069a6e81214461e51f6c6ce4retrieved 2026-05-05
  • Etherscan
    https://etherscan.io/address/0x055E84e7FE8955E2781010B866f10Ef6E1E77e59retrieved 2026-05-05

Methodology #

Count upgrades executed in the last 30 days without going through the declared timelock path.

See the full factor methodology and distribution across all protocols →

rubric_version v1.7.0 protocol lombard factor RD-F-138 score green collected_at 2026-05-05 12:03:08