Audit-to-deploy gap
Babylon Protocol's assessment for RD-F-006 — scored green on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.
Evidence summary #
Phase-1: Coinspect report Aug 5 2024, mainnet Aug 22 2024 — 17-day gap (excellent). Zellic Phase-1 ended May 31 2024, Phase-1 launch Aug 22 2024 — 83 days (at margin but acceptable). Genesis chain: Coinspect/Zellic Phase-2 completed Feb–Mar 2025; Genesis launched April 10 2025 — 38–59-day gap (within threshold). No >90-day drift detected for confirmed deployments.
Sources #
- DocsProtocol profile §2Profile §2 lifecycle (Genesis launch Apr 10 2025)retrieved 2026-05-04
Methodology #
Measure the number of days between the audit report sign-off date and the mainnet deploy of the audited bytecode.
See the full factor methodology and distribution across all protocols →
rubric_version v1.7.0 protocol babylon-protocol factor RD-F-006 score green collected_at 2026-05-04 19:43:27