Audit recency
Symbiotic's assessment for RD-F-002 — scored yellow on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.
Evidence summary #
Last full-scope audit of core contracts: Certora (formal verification + manual review) completed September 2, 2024. As of assessment date (2026-05-16) that is approximately 622 days since last audit. The Sherlock 2025-06 contest covered only the Relay module (separate repo, not core contracts). Immutability means no new code, but audit age exceeds standard thresholds.
Sources #
- AuditCertora Symbiotic Audit and Formal Verification ReportCertora Symbiotic formal verification engagement August 12 to September 2 2024retrieved 2026-05-16
- Sherlock Audit 2025-06 Symbiotic RelaySherlock 2025-06-symbiotic-relay covering Relay SDK only, not core contractsretrieved 2026-05-16
Methodology #
Measure the number of days between today and the sign-off date of the most recent audit report covering the currently-deployed bytecode.
See the full factor methodology and distribution across all protocols →
rubric_version v1.7.0 protocol symbiotic factor RD-F-002 score yellow collected_at 2026-05-16 09:25:24