Audit-to-deploy gap

Uniswap (v2 + v3)'s assessment for RD-F-006 — scored green on the v1.7.0 rubric. The evidence below is the curator's reasoning for this score.

Evidence summary #

V3: ToB signed off March 12 2021; ABDK core approximately March 23 2021; launch May 5 2021. Audit-to-deploy: ~43 days (ABDK) to 54 days (ToB) — both under 60-day threshold. V2: dapp.org.uk review completed April 2020; launch May 18 2020 — within 60 days. Both versions: green.

Detail #

The RC cycle for V3 (rc.0 March 22 -> rc.2 April 20 -> v1.0.0 May 4) shows controlled post-audit stabilization with no material pool logic changes after the audit sign-off dates. For V2, the dapp.org.uk review was conducted during development (Jan-Apr 2020) and the report was finalized before the May 18 2020 launch, with the gap estimated at under 60 days for the final sign-off.

Sources #

Methodology #

Measure the number of days between the audit report sign-off date and the mainnet deploy of the audited bytecode.